Completed Projects

  • Home
  • Completed Projects

Some of our successful Projects in different majors

Black Powder Management Project - New Separation and Filtration for EPC Works

Client: M/S ADNOC Gas Processing

Work Scope:

  • Civil Works
  • Piping Works
  • Mechanical Works
  • Electrical and Instrumentation Works
  • Pre-commissioning Works
  • Commissioning Works

EPC Works ICAD Gas Treatment to Remove H2S

Client: M/S ADNOC Gas Processing

Work Scope:

  • Civil Works
  • Piping Works
  • Mechanical Works
  • Electrical and Instrumentation Works
  • Pre-commissioning Works
  • Commissioning Works

Development of Asharej Roundabout and Markhaniya Roundabout

Client: M/S Musanada

Work Scope:

  • Pipeline Construction
  • Civil Works
  • HDD
  • Hydrotest”

ICAD III Natural Gas Network Extension - Engineering Procurement & Construction Contract

Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)

Work Scope:

  • Expansion of Natural Gas Network in ICAD III towards improving the services of Natural Gas supply to the tenants in this area total of 15 KM different sizes from 4 inch to 18 inch.
  • EPC Works including pre-commissioning, commissioning and start-up

On-shore Emergency Pipeline Repair system (EPRS)

Client: M/S Dolphin Energy Limited

Work Scope:

  • Sectional Replacement
  • Grinding/dressing Repairs
  • Leak Clamp Repairs
  • Steel Sleeve Repairs
  • Composite Sleeve Repairs
  • Block Valve Station Repairs
  • External Clothing
  • Reinstatement

Conversion of Existing Fuel Station Into CNG Station at Al Zahiya, Abu Dhabi

Client: M/S ADNOC Distribution

Work Scope:

  • Conversion of existing Linear Service Station (Al Zahiyah Service Station) to dedicated CNG Station at Abu Dhabi - Al Zahiya
  • Includes EPC
  • Relocation of CNG Compressor skid and equipment from Abu Al Abyad 1 Service Station to Al Zahiya Service Station
  • Documentation including NOC’s approvals and building permit from local authorities having jurisdiction.
  • Design and construction of compressor house concrete foundation including backpack PRS, decanting pillar, windsock, concrete hardstand and pole light with foundation.
  • Design and construction of LV Room including all the required building services as per the drawings and specifications.
  • Laying cables and pipes as per the drawings and specifications.
  • Modifications to the existing spreader and signage’s as per the drawings and specifications.
  • Site works, pavement and fencing as per the drawings and specifications.
  • All required MEP works as per the drawings and specifications.
  • Performance guarantee for 1 year from the date of commissioning of the relocated facility at Al Zahiya.

Hot Tapping Works Taweelah Compressor GASCO / Dolphin Project

Client: M/S Al Jaber Energy Services / GASCO

Work Scope:

  • Simulation Work for Hot Tapping
  • Hot Tapping Welding Work
  • Documentation
  • NDT
  • Welding / Welding Inspection, Fit-up, Leak Test

Supply of Split Tee and Test Ring as well as Welding Process of Split Tee Including Simulation Test for ADNOC Gas Processing, Buhasa

Client: M/S Doosan Babcock M/S ADNOC Gas Processing (GASCO)

Work Scope:

  • Simulation Test
  • Site Works
  • Supply of Split Tee and Test Ring

In-Service Sleeve Welding & Pipelines Rehabilitation Works for Gasco Pipeline Network Division

Client: M/S ADNOC Gas Processing (GASCO)

Work Scope:

  • Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 18”” Sleeve (2m length) for 18”” Condensate Pipeline (LocationHabshan/Ruwais)
  • Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 30”” Sleeve (4m length) for 30”” Gas Pipeline Bab to Ruwais (Location-Ruwais)
  • Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 36”” sleeve (1m length) for 36”” Lean Gas Pipeline Th.C to Asab1 (Location-Habshan/Asab)

Replacement of Corroded Sections of Habshan 36 Inch MP Gas Pipeline (Unit 112 to Unit 113) for Gas Pipeline Network Division

Client: M/S ADNOC Gas Processing (GASCO)

Work Scope:

  • Mobilization & De-mobilization of all the equipment / tools / manpower and other resources required for replacement of the pipeline section.
  • Decommissioning of pipeline, supply of nitrogen (Liquid Nitrogen tank and complete accessories like pump, hoses, etc) for purging, cleaning with pig (multiple pig runs), cutting the pipeline section & removal etc.
  • Fabrication, Testing, Laying, Alignment, Welding & Hydrotesting of Pipeline Joints for replacement of pipeline section.
  • NDT/Inspection for replacement of pipeline section.
  • Pre-Commissioning & Commissioning, gauging run and assistance to start-up of new facilities. Supply of Nitrogen, Pigs, achieving of dew point as per DGS requirement for replacement of pipeline section.
  • Removal of existing corroded section of pipeline by cold cutting method.
  • Removal of existing sand by hand excavation of 1.5 mtr. depth and 50mts. long.
  • Excavation for safe cutting / removal of pipeline.
  • Backfilling of the excavated area as per SOW & GASCO DGS.
  • Reinstatement of the area after completion of replacement of pipeline section.
  • Supply of spools for fabrication & replacement of MP Gas Pipeline section

Maintenance Services for Cross Country Pipelines for Pipeline Terminal Operations Departmen

Client: M/S ADNOC Refining - TAKREER

Work Scope:

The main scope provides the methodology and steps to be adopted in normal/ breakdown scenarios for all pipelines in ADNOC Refining network. Maintenance and repair services in the pipeline corridor to a competent on routine and call out basis. The services are required to be performed as per COMPANY’s specifications, relevant standards and requirements of this scope of work, using approved / certified material, manpower, equipemtna nd procedures. The routine maintenance and repair activities to be carried out in the ADNOC Refining pipeline corridor consists of but not limited to the following:

  • Civil Works
  • Mechanical Works
  • Integrity & Inspection Works
  • Telecom, Instrument & Electrical Maintenance Works
  • Oil Spill response (OSR) Services

Hot Tapping Works Taweelah Compressor GASCO / Dolphin Project

Client: M/S Al Jaber Energy Services / GASCO

Work Scope:

  • Simulation Work for Hot Tapping
  • Hot Tapping Welding Work
  • Documentation
  • NDT
  • Welding / Welding Inspection, Fit-up, Leak Test

Operation & Maintenance & Meter Management Services of Natural Gas Facilities in ICAD and Mussafah Areas

Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)

Work Scope:

  • 25 Meter Replacement

Operation & Maintenance & Meter Management Services of Natural Gas Facilities in ICAD and Mussafah Areas

Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)

Work Scope:

  • Main Pipeline network at ICAD I,II and III
  • PRS Operations, monitoring and routing and non-routine maintenance of NG Networks and facilities
  • Meter Management
  • NG Meter & PRS enhacnement
  • Arrange a Third Party Inspector (TPI)
  • Review and verification of engineering works
  • Supervise site works and issue permit to work
  • Intersection valves
  • Cathodic Protection (sacrificial and impressed current)
  • Branch feeding to individual premises
  • Gas PRMS for each individual premises
  • Hot Tapping Valve Chamber

Hilton Hotel, Abu Dhabi

Project: Hilton Hotel

Location: Yas Island, Abu Dhabi

Client: Miral

Consultant: WSP

Main Contractor: San Jose/Fibrex

Work Scope: NG System Design, Supply, Installation, Testing and Commissioning of:

  • 1 No PRMS
  • 3000 meter’s network piping approximate.
  • 500 meter’s underground Piping approximate.
  • Natural Gas Detection System.
  • Restaurant kitchens 13 No’s.
  • ADNOC & TPI approvals.

Yas Water Front Retail, Yas Island, Abu Dhabi

Project: Yas Water Front

Location: YYas Island, Abu Dhabi

Client: Miral

Consultant: WSP

Main Contractor: San Jose/Fibrex

Work Scope: NG System Design, Supply, Installation, Testing and Commissioning of:

  • 1 No PRMS
  • 1000 meter’s network piping approximate.
  • 1500 meter’s underground Piping approximate.
  • Natural Gas Detection System.
  • Retail Kitchens 29 No’s.
  • ADNOC & TPI approvals.

Asia Asia Restaurant, Abu Dhabi

Project: Asia Asia Restaurant

Location: : Yas Island, Abu Dhabi

Client: Miral

Consultant: Solution Interiors

Main Contractor: Arco Group

Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning

Lock Stock & Barrel Restaurant, Abu Dhabi

Project: Lock Stock & Barrel Restaurant

Location: : Yas Island, Abu Dhabi

Client: Miral

Consultant: Solution Interiors

Main Contractor: Arco Group

Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning

Paradiso Restaurant, Abu Dhabi

Project: Paradiso Restaurant

Location: : Yas Island, Abu Dhabi

Client: Miral

Consultant: Mark Habre and Associates

Main Contractor: Munawel Interiors

Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning

Al Hameli Commercial Building, Abu Dhabi

Project: Al Hameli Commercial Building

Location: : Abu Dhabi

Client: Rasheed Mohammed Rasheed Al Hameli

Consultant: Shaheen Engineering Consultancy

MEP Contractor: Barracuda Electro Mechanical Contracting LLC

Work Scope: : LPG System Design, Supply, Installation, Testing and Commissioning

Armed Forces Officers Club & Hotel Abu Dhabi

Project: Armed Forces Officers Club & Hotel

Location: : Abu Dhabi

Client: Armed forces

Consultant: Atkins

Main Contractor: Elmacs Co LLC

Work Scope: : SNG System Design, Supply, Installation, Testing and Commissioning of:

  • 1 No LPG Tank
  • SNG Module
  • 2 No PRDP
  • 50 meter’s network piping approximate
  • Natural Gas Detection System
  • Kitchens 07 No’s
  • ADNOC & TPI approvals

Reem Mall , Abu Dhabi

Project: Reem Mall Package C3 & C4

Location: : Abu Dhabi

Client: Alfarwaniya

Consultant: Dewan Architects & Engineer

Main Contractor: Itinera/Ghantoot – JV

Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning of:

  • 2 No PRMS
  • 4000 meter’s network piping approximate
  • Natural Gas Detection System
  • Retail Kitchens 89 No’s
  • ADNOC & TPI approvals