Black Powder Management Project - New Separation and Filtration for EPC Works
Client: M/S ADNOC Gas Processing
Work Scope:
- Civil Works
- Piping Works
- Mechanical Works
- Electrical and Instrumentation Works
- Pre-commissioning Works
- Commissioning Works
EPC Works ICAD Gas Treatment to Remove H2S
Client: M/S ADNOC Gas Processing
Work Scope:
- Civil Works
- Piping Works
- Mechanical Works
- Electrical and Instrumentation Works
- Pre-commissioning Works
- Commissioning Works
Development of Asharej Roundabout and Markhaniya Roundabout
Client: M/S Musanada
Work Scope:
- Pipeline Construction
- Civil Works
- HDD
- Hydrotest”
ICAD III Natural Gas Network Extension - Engineering Procurement & Construction Contract
Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)
Work Scope:
- Expansion of Natural Gas Network in ICAD III towards improving the services of Natural Gas supply to the tenants in this area total of 15 KM different sizes from 4 inch to 18 inch.
- EPC Works including pre-commissioning, commissioning and start-up
On-shore Emergency Pipeline Repair system (EPRS)
Client: M/S Dolphin Energy Limited
Work Scope:
- Sectional Replacement
- Grinding/dressing Repairs
- Leak Clamp Repairs
- Steel Sleeve Repairs
- Composite Sleeve Repairs
- Block Valve Station Repairs
- External Clothing
- Reinstatement
Conversion of Existing Fuel Station Into CNG Station at Al Zahiya, Abu Dhabi
Client: M/S ADNOC Distribution
Work Scope:
- Conversion of existing Linear Service Station (Al Zahiyah Service Station) to dedicated CNG Station at Abu Dhabi - Al Zahiya
- Includes EPC
- Relocation of CNG Compressor skid and equipment from Abu Al Abyad 1 Service Station to Al Zahiya Service Station
- Documentation including NOC’s approvals and building permit from local authorities having jurisdiction.
- Design and construction of compressor house concrete foundation including backpack PRS, decanting pillar, windsock, concrete hardstand and pole light with foundation.
- Design and construction of LV Room including all the required building services as per the drawings and specifications.
- Laying cables and pipes as per the drawings and specifications.
- Modifications to the existing spreader and signage’s as per the drawings and specifications.
- Site works, pavement and fencing as per the drawings and specifications.
- All required MEP works as per the drawings and specifications.
- Performance guarantee for 1 year from the date of commissioning of the relocated facility at Al Zahiya.
Hot Tapping Works Taweelah Compressor GASCO / Dolphin Project
Client: M/S Al Jaber Energy Services / GASCO
Work Scope:
- Simulation Work for Hot Tapping
- Hot Tapping Welding Work
- Documentation
- NDT
- Welding / Welding Inspection, Fit-up, Leak Test
Supply of Split Tee and Test Ring as well as Welding Process of Split Tee Including Simulation Test for ADNOC Gas Processing, Buhasa
Client: M/S Doosan Babcock M/S ADNOC Gas Processing (GASCO)
Work Scope:
- Simulation Test
- Site Works
- Supply of Split Tee and Test Ring
In-Service Sleeve Welding & Pipelines Rehabilitation Works for Gasco Pipeline Network Division
Client: M/S ADNOC Gas Processing (GASCO)
Work Scope:
- Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 18”” Sleeve (2m length) for 18”” Condensate Pipeline (LocationHabshan/Ruwais)
- Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 30”” Sleeve (4m length) for 30”” Gas Pipeline Bab to Ruwais (Location-Ruwais)
- Fit-up, Welding (Longitudinal & Circumferential) and NDT for Sleeve Repair 36”” sleeve (1m length) for 36”” Lean Gas Pipeline Th.C to Asab1 (Location-Habshan/Asab)
Replacement of Corroded Sections of Habshan 36 Inch MP Gas Pipeline (Unit 112 to Unit 113) for Gas Pipeline Network Division
Client: M/S ADNOC Gas Processing (GASCO)
Work Scope:
- Mobilization & De-mobilization of all the equipment / tools / manpower and other resources required for replacement of the pipeline section.
- Decommissioning of pipeline, supply of nitrogen (Liquid Nitrogen tank and complete accessories like pump, hoses, etc) for purging, cleaning with pig (multiple pig runs), cutting the pipeline section & removal etc.
- Fabrication, Testing, Laying, Alignment, Welding & Hydrotesting of Pipeline Joints for replacement of pipeline section.
- NDT/Inspection for replacement of pipeline section.
- Pre-Commissioning & Commissioning, gauging run and assistance to start-up of new facilities. Supply of Nitrogen, Pigs, achieving of dew point as per DGS requirement for replacement of pipeline section.
- Removal of existing corroded section of pipeline by cold cutting method.
- Removal of existing sand by hand excavation of 1.5 mtr. depth and 50mts. long.
- Excavation for safe cutting / removal of pipeline.
- Backfilling of the excavated area as per SOW & GASCO DGS.
- Reinstatement of the area after completion of replacement of pipeline section.
- Supply of spools for fabrication & replacement of MP Gas Pipeline section
Maintenance Services for Cross Country Pipelines for Pipeline Terminal Operations Departmen
Client: M/S ADNOC Refining - TAKREER
Work Scope:
The main scope provides the methodology and steps to be adopted in normal/ breakdown scenarios for all pipelines in ADNOC Refining network. Maintenance and repair services in the pipeline corridor to a competent on routine and call out basis. The services are required to be performed as per COMPANY’s specifications, relevant standards and requirements of this scope of work, using approved / certified material, manpower, equipemtna nd procedures. The routine maintenance and repair activities to be carried out in the ADNOC Refining pipeline corridor consists of but not limited to the following:
- Civil Works
- Mechanical Works
- Integrity & Inspection Works
- Telecom, Instrument & Electrical Maintenance Works
- Oil Spill response (OSR) Services
Hot Tapping Works Taweelah Compressor GASCO / Dolphin Project
Client: M/S Al Jaber Energy Services / GASCO
Work Scope:
- Simulation Work for Hot Tapping
- Hot Tapping Welding Work
- Documentation
- NDT
- Welding / Welding Inspection, Fit-up, Leak Test
Operation & Maintenance & Meter Management Services of Natural Gas Facilities in ICAD and Mussafah Areas
Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)
Work Scope:
- 25 Meter Replacement
Operation & Maintenance & Meter Management Services of Natural Gas Facilities in ICAD and Mussafah Areas
Client: M/S Higher Corporation for Specialized Economic Zones (ZONESCORP)
Work Scope:
- Main Pipeline network at ICAD I,II and III
- PRS Operations, monitoring and routing and non-routine maintenance of NG Networks and facilities
- Meter Management
- NG Meter & PRS enhacnement
- Arrange a Third Party Inspector (TPI)
- Review and verification of engineering works
- Supervise site works and issue permit to work
- Intersection valves
- Cathodic Protection (sacrificial and impressed current)
- Branch feeding to individual premises
- Gas PRMS for each individual premises
- Hot Tapping Valve Chamber
Hilton Hotel, Abu Dhabi
Project: Hilton Hotel
Location: Yas Island, Abu Dhabi
Client: Miral
Consultant: WSP
Main Contractor: San Jose/Fibrex
Work Scope: NG System Design, Supply, Installation, Testing and Commissioning of:
- 1 No PRMS
- 3000 meter’s network piping approximate.
- 500 meter’s underground Piping approximate.
- Natural Gas Detection System.
- Restaurant kitchens 13 No’s.
- ADNOC & TPI approvals.
Yas Water Front Retail, Yas Island, Abu Dhabi
Project: Yas Water Front
Location: YYas Island, Abu Dhabi
Client: Miral
Consultant: WSP
Main Contractor: San Jose/Fibrex
Work Scope: NG System Design, Supply, Installation, Testing and Commissioning of:
- 1 No PRMS
- 1000 meter’s network piping approximate.
- 1500 meter’s underground Piping approximate.
- Natural Gas Detection System.
- Retail Kitchens 29 No’s.
- ADNOC & TPI approvals.
Asia Asia Restaurant, Abu Dhabi
Project: Asia Asia Restaurant
Location: : Yas Island, Abu Dhabi
Client: Miral
Consultant: Solution Interiors
Main Contractor: Arco Group
Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning
Lock Stock & Barrel Restaurant, Abu Dhabi
Project: Lock Stock & Barrel Restaurant
Location: : Yas Island, Abu Dhabi
Client: Miral
Consultant: Solution Interiors
Main Contractor: Arco Group
Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning
Paradiso Restaurant, Abu Dhabi
Project: Paradiso Restaurant
Location: : Yas Island, Abu Dhabi
Client: Miral
Consultant: Mark Habre and Associates
Main Contractor: Munawel Interiors
Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning
Al Hameli Commercial Building, Abu Dhabi
Project: Al Hameli Commercial Building
Location: : Abu Dhabi
Client: Rasheed Mohammed Rasheed Al Hameli
Consultant: Shaheen Engineering Consultancy
MEP Contractor: Barracuda Electro Mechanical Contracting LLC
Work Scope: : LPG System Design, Supply, Installation, Testing and Commissioning
Armed Forces Officers Club & Hotel Abu Dhabi
Project: Armed Forces Officers Club & Hotel
Location: : Abu Dhabi
Client: Armed forces
Consultant: Atkins
Main Contractor: Elmacs Co LLC
Work Scope: : SNG System Design, Supply, Installation, Testing and Commissioning of:
- 1 No LPG Tank
- SNG Module
- 2 No PRDP
- 50 meter’s network piping approximate
- Natural Gas Detection System
- Kitchens 07 No’s
- ADNOC & TPI approvals
Reem Mall , Abu Dhabi
Project: Reem Mall Package C3 & C4
Location: : Abu Dhabi
Client: Alfarwaniya
Consultant: Dewan Architects & Engineer
Main Contractor: Itinera/Ghantoot – JV
Work Scope: : NG System Design, Supply, Installation, Testing and Commissioning of:
- 2 No PRMS
- 4000 meter’s network piping approximate
- Natural Gas Detection System
- Retail Kitchens 89 No’s